Saturday, 13 June 2015


Problems occurred ( information from the owner / user ): 

Designing the hospital alarm system / such as nurse call system 
Designing the hospital alarm system

Parts of the job:

a. Pulling cable

  1. Pulling cable 2x1.5 mm2 for power supply 
  2. Pulling cable 4x1.5 mm2 from hospital room to wheelhouse 
  3. Pulling cable 2x1.5 mm2 from switch call to buzzer in above the door hospital room 
  4. Pulling cable 4x1.5 mm2 from switch call to pull switch in the bath room,hospital room

Installing equipment

  1. Main cabinet in wheelhouse area 
  2. Breaker 2phasse in distribution 24 vdc panel 
  3. Switch call and indicator lamp in the bed hospital room 
  4. Buzzer in above the door hospital room 
  5. Pull switch in the bathroom 
  6. Buzzer in above the door bathroom


Thursday, 19 March 2015

Low insulation in battery charger and discharge panel

Equipment Specification:

Battery charger & discharger panel 

  • Brand : KTE 
  • Voltage : 440V,60Hz
Servicing Battery charger & discharger panel

Equipment Specification:

  • Heater : 24000 Watt, 360 Volts, 36.5 Ampr, 3 Phase
Cleaning heater & chamber Heater Fresh Water
Fresh water heater chamber 

Problems occurred ( information from the owner / user ):

  • Cleaning the heater element and chamber heater

Parts of the job:

1. Clean the heater

  1. Unplug the there heater in chamber 
  2. Clean the crust attached 
  3. Reinstall the heater
Cleaning heater & chamber Heater Fresh Water

2. Clean the chamber heater


  1. Unplug the chamber heater 
  2. Clean the crust attached
  3. Reinstall the chamber



 